Skip to content

Taylor Bridge inspection begins

Bridge inspections begins.
TaylorBridgeRoebling
A vital link in the Alaska Highway.

Taylor Bridge inspection work starts today.

Highway 97 will be single-lane alternating traffic between Big Bam Road and Taylor Bridge just south of Taylor, as a detailed inspection of Taylor Bridge takes place over the next several days.

Single-lane alternating traffic will be in place from:

Tuesday, May 18 through Friday, May 21 (except 7 to 9 a.m. and 3 to 6 p.m.), Sunday, May 23, Tuesday, May 25 through Friday, May 29 (except 7 to 9 a.m. and 3 to 6 p.m.), and Sunday, May 30

Detailed inspections are done every few years as part of the ministry maintenance and rehab program. As well, the information gained will help inform the long-term plan for the Taylor Bridge.

Drivers are reminded to observe posted speed limits, traffic control devices and flag persons, and are encouraged to check for the most up-to-date information before travel at: www.DriveBC.ca